Back to ProjectsEducation

School CLT Frame Extension

Graveney School Extension
Education
£920k
22 Weeks
School CLT Frame Extension

Project Overview

Sector
Education
Location
Graveney School Extension
Contract Value
£920k
Project Duration
22 Weeks
Project image 1
Project image 2
Project image 3

Scope of Works

Graveney School — CLT Teaching Block

Encore Building Services delivered the electrical fit-out for Graveney School's new cross-laminated timber teaching block in Tooting, South London. The project created a highly sustainable, architecturally distinctive education building, with exposed CLT forming both the primary structure and the finished internal surface throughout classrooms, circulation spaces and communal areas.

The building was designed around a prefabricated CLT structural system. Unlike a conventional build, where penetrations and service routes can be altered during construction, all openings, drillings and coordinated service allowances had to be fully resolved before the timber panels entered manufacture. This made the design stage critical: once factory production commenced, opportunities for site alteration were extremely limited. All M&E fixtures were face-fixed to the exposed timber surfaces.

The completed school building uses exposed CLT internally, eliminating the need for most internal linings and leaving the structure, building services and construction logic visible to staff and pupils. This approach reduced material use while creating a robust, warm and legible learning environment.

Electrical scope

Encore Building Services' remit included the design coordination, procurement, installation, testing, commissioning and handover of the electrical infrastructure across the teaching accommodation, shared areas, circulation spaces and external interfaces.

The installation was designed as an exposed, face-fixed system, with metal containment and visible electrical services forming a deliberate element of the finished architectural expression.

Distribution and power

The power installation was coordinated in detail before CLT fabrication, with all containment routes, penetrations and fixing positions confirmed prior to panel manufacture.

Our scope included:

  • Coordination of incoming electrical services, main distribution infrastructure, local distribution boards, submains, protective devices, isolation points, earthing and bonding.
  • Detailed coordination of containment penetrations, cable routes, junction boxes, service openings and fixing positions before CLT fabrication.
  • Electrical load assessment and distribution design to serve classrooms, study areas, circulation spaces, staff accommodation, welfare areas and building-services plant.
  • Face-fixed metal trunking, tray, basket, conduit and associated containment installed to complement the exposed CLT interior.
  • General small-power installations throughout classrooms, teaching spaces, independent-study areas, staff spaces, storage areas and circulation zones.
  • Dedicated supplies for interactive teaching screens, projectors, AV equipment, IT equipment, printers, charging facilities, cleaning equipment and specialist educational equipment.
  • Power provisions for mechanical plant, ventilation systems, heat-recovery equipment, heating controls, water-heating equipment and other associated MEP systems.
  • Local isolators, fused connection units, control interfaces and maintenance provisions for building-services equipment.
  • Electrical containment and outlet positions coordinated precisely with furniture layouts, teaching-wall locations, storage joinery, display boards and accessible learning-space requirements.
  • Full electrical testing, inspection, certification, circuit identification, as-built documentation and O&M handover.

CLT design coordination

The defining challenge of the project was the need to finalise all electrical coordination before the CLT panels were manufactured. Every penetration, fixing zone and services route had to be reviewed carefully to protect the structural and visual integrity of the timber frame.

Our pre-construction and design-phase activities included:

  • Detailed review of architectural, structural, MEP and CLT-manufacturer drawings prior to fabrication.
  • Coordination of all electrical cable routes, containment positions, junction-box locations, lighting fixings, socket outlets, data points, fire-alarm devices and controls.
  • Identification of required factory-cut penetrations through CLT walls, floors and roof panels for electrical containment and coordinated MEP services.
  • Confirmation of permissible fixing zones, timber-panel depths, fire requirements, acoustic considerations and structural restrictions.
  • Coordination of lighting and electrical fixing points to avoid unacceptable drilling, cutting or damage to visible timber surfaces.
  • Interface coordination with mechanical services to ensure that combined M&E routes were efficient, uncluttered and compatible with the exposed-services strategy.
  • Development of coordinated builders'-work drawings and penetration schedules for issue to the CLT manufacturer.
  • Early technical engagement with the architect, structural engineer, MEP consultant, main contractor and CLT supply chain to resolve risks before production.
  • Final confirmation of coordinated drawings before the factory-manufacturing release, preventing costly delays, abortive work and unauthorised on-site alterations.

CLT was selected in part because it allowed close control of design and factory production, rapid site erection and reduced wet-trade construction. The project team emphasised early consultant and CLT-manufacturer involvement so proposals could be tested for cost, buildability and efficiency before construction.

Lighting and exposed services

All electrical services were intentionally exposed, creating a functional and durable installation aligned with the building's educational and architectural character. The visible containment, cable routes and face-fixed fittings had to be installed with a level of consistency and craftsmanship normally associated with architectural finishes.

The lighting and containment scope included:

  • Energy-efficient LED lighting throughout classrooms, independent-study areas, staff spaces, circulation routes and ancillary accommodation.
  • General teaching lighting designed to provide suitable, consistent illumination for learning, reading, screen use and collaborative activity.
  • Feature and architectural lighting where required to support the character of double-height study areas, galleries, balconies and communal spaces.
  • Emergency lighting integrated within the exposed-services strategy, with routes, fittings and containment selected to remain visually consistent with the building design.
  • Exposed galvanised metal conduit, tray, basket and trunking carefully set out against CLT walls, ceilings and structural elements.
  • Surface-mounted junction boxes, electrical accessories and lighting supports positioned with disciplined alignment, spacing and fixing details.
  • Dimmable or zoned lighting-control arrangements, allowing teaching staff to adjust the lighting for lesson delivery, presentations, independent study and cleaning.
  • Daylight-responsive and occupancy-based controls, where required, to support the building's energy-efficiency objectives.
  • Careful coordination of lighting layouts with the building's window positions, exposed timber structure, ceiling geometry, ventilation systems and teaching layouts.
  • Final testing, aiming, controls commissioning and user familiarisation.

The exposed internal CLT was intended to make the building's construction visible to pupils and staff, with no concealed ceiling voids or internal linings used to hide services.

Data, fire and life safety

The electrical scope included the core infrastructure required for a modern teaching environment and compliant education building.

Data and communications:

  • Structured-cabling containment and routes to classrooms, study areas, staff accommodation and building communications spaces.
  • Power and data provisions for teaching displays, projectors, AV systems, Wi-Fi access points, printers and IT equipment.
  • Communications-rack power and containment, together with coordinated cable pathways for IT and network infrastructure.
  • Flexible data outlet locations to support evolving classroom arrangements and future digital-learning requirements.

Fire alarm and security:

  • Fire-alarm containment, cabling, detectors, manual call points, sounders, visual alarm devices and associated interfaces.
  • Coordination of fire-alarm devices with visible timber surfaces, lighting, ventilation routes, structural elements and exposed containment.
  • Emergency-lighting installations throughout escape routes, classrooms, stairways, circulation spaces and external egress areas.
  • Security-system containment, power and coordinated provisions for access control, intruder alarm, CCTV and related operational systems.
  • Testing, commissioning, cause-and-effect verification, certification and final handover documentation.

Coordination and delivery

The project required a highly disciplined coordination process before works began on site, followed by equally careful installation once the CLT frame had been erected.

Our delivery approach included:

  • Collaborative design workshops involving the architect, structural engineer, CLT manufacturer, MEP consultant, main contractor and specialist suppliers.
  • Early issue and review of coordinated electrical drawings, reflected ceiling plans, containment layouts, penetration schedules and builder's-work requirements.
  • Rigorous sign-off procedures prior to CLT-panel manufacture.
  • Sequenced installation following erection of the timber structure, with protection measures to prevent marking, damage or unnecessary penetrations to exposed CLT.
  • Precision setting-out of every exposed containment route, light fitting, socket, detector, junction box and surface-mounted accessory.
  • Close mechanical-and-electrical coordination to maintain clean, intelligible and uncluttered service routes.
  • Ongoing quality inspections to ensure that exposed metalwork, conduits and fittings achieved the required consistency of alignment, finish and fixing quality.
  • Progressive testing and commissioning, followed by final certification, O&M information, record drawings and handover support to the school.

Completed outcome

The completed Graveney School teaching block provides a robust, low-carbon and visually distinctive learning environment, where the natural warmth of exposed CLT is complemented by a precisely coordinated, face-fixed electrical installation.

Encore Building Services delivered an electrical solution that respected the fundamental principles of the building: no unnecessary concealment, no uncontrolled on-site alteration and no compromise to the exposed timber structure. The result is a durable and serviceable installation in which metal containment, lighting, power, data and life-safety systems form a clear and carefully composed part of the school's architecture.