Back to ProjectsHotel

The Carlton Tower Jumeirah

Knightsbridge - London
Hotel
£1.8m
28 Weeks
The Carlton Tower Jumeirah

Project Overview

Sector
Hotel
Location
Knightsbridge - London
Contract Value
£1.8m
Project Duration
28 Weeks
Project image 1
Project image 2
Project image 3

Scope of Works

The Carlton Tower Jumeirah — Al Mare & Hotel Refurbishment

Encore Building Services delivered a comprehensive electrical design and fit-out package as part of the landmark refurbishment of The Carlton Tower Jumeirah, Knightsbridge on behalf of main contractor Beck Interiors The works began with the creation of Al Mare, the hotel's signature Italian restaurant, before extending across key front-of-house areas, including the reception and arrival sequence, public spaces and guest accommodation.

The project formed part of a major transformation of the hotel, which introduced a new foyer and reception, Al Mare, upgraded guest rooms and suites, and a renewed health and leisure offering. The refurbishment repositioned the property at the highest end of the London luxury-hospitality market, with the hotel's accommodation reconfigured to 186 larger rooms and suites.

Our role was to translate the interior and lighting design vision into a fully coordinated, technically robust and operationally resilient electrical installation. In a five-star hotel environment, every electrical detail had to perform discreetly: lighting had to create atmosphere without revealing the technology behind it; power and data had to support guests and hotel operations without compromising the interior aesthetic; and life-safety systems had to be installed, commissioned and integrated without disrupting the luxury guest experience.

Electrical scope

The works included the design coordination, procurement, installation, testing, commissioning and handover of electrical and associated ELV systems throughout Al Mare and the wider hotel refurbishment.

Al Mare restaurant

The original core package comprised the full electrical design and fit-out of Al Mare, including the restaurant, bar, private dining and back-of-house interfaces. The completed restaurant was conceived as a refined Italian dining destination within the hotel, with specialist decorative, architectural and integrated joinery lighting playing a central role in the overall guest experience.

Our scope included:

  • Design development and technical coordination of the electrical installation with the client, project team, interior designers, kitchen consultants, lighting designers and specialist suppliers.
  • New LV distribution infrastructure, including distribution boards, submains, local isolators, protective devices, circuit identification and final electrical connections.
  • Containment systems for power, lighting, fire, data, controls and specialist services, carefully coordinated within ceilings, wall build-ups, joinery, floor zones and back-of-house areas.
  • General small-power installations for front-of-house, bar operations, private-dining facilities, point-of-sale systems, cleaning, maintenance and flexible operational use.
  • Dedicated power supplies for kitchen equipment, refrigeration, cooking equipment, extraction interfaces, food-preparation areas, bar equipment and specialist catering equipment.
  • Coordination of kitchen power layouts directly with the executive chef and kitchen-design team, ensuring final equipment positions, operational adjacencies, maintenance clearances and service provisions matched the intended kitchen workflow.
  • Power and connection provisions for specialist restaurant systems, including AV, music, feature displays, operational equipment and integrated joinery requirements.
  • Architectural lighting, decorative lighting, feature pendants, recessed lighting, joinery lighting, wall lights, table lighting and local task lighting.
  • Lighting-control systems to create pre-set scenes for breakfast, lunch, dinner, private events, cleaning, set-up and late-evening operation.
  • Emergency lighting and life-safety provisions integrated sensitively within the restaurant's high-end architectural finishes.
  • Fire-alarm infrastructure, interfaces and final devices coordinated around ceilings, decorative elements and specialist finishes.
  • Data containment and infrastructure supporting restaurant operations, point-of-sale systems, communications and connectivity requirements.
  • Coordination with bespoke lighting manufacturers and suppliers to accommodate specialist fittings, control gear, mounting details, dimming compatibility, access requirements and final aiming.

The lighting strategy across the hotel was deliberately layered, using restrained recessed and architectural lighting alongside decorative fittings, joinery illumination and feature chandeliers. In the Al Mare private dining room, the design included a bespoke 1.8-metre brass pendant above the dining table, while the all-day dining environment used a considered balance of coffer lighting, downlights, wall, table and floor lighting.

Hotel common areas

Following the successful delivery of Al Mare, our scope expanded into key hotel public areas and the guest-room refurbishment programme.

Reception and arrival areas

The front-of-house works supported a reimagined arrival experience, including the double-height lobby and reception. The hotel's refurbished entrance incorporated bespoke lighting, while the main lobby was centred around a major fluted chandelier installation, supported by carefully controlled architectural and feature lighting.

Our electrical scope included:

  • LV power distribution and local electrical infrastructure to reception, concierge, lobby, lounge and circulation spaces.
  • Architectural lighting installations, including recessed, linear, wall-mounted, coffer and feature lighting.
  • Installation and integration of decorative light fittings and statement chandeliers, including specialist support, power, dimming, control, access and commissioning coordination.
  • Lighting-control systems programmed to support changing daylight conditions, guest arrival periods, evening ambience, events and overnight operation.
  • Integrated lighting to joinery, artwork, display features, reception desks and architectural details.
  • Small power for reception operations, concierge functions, guest services, cleaning and facilities-management requirements.
  • Data and communications infrastructure to support front-desk operations, hotel systems and guest-service functions.
  • Fire-alarm devices, interfaces and life-safety systems coordinated carefully with premium finishes and feature ceilings.
  • Electrical interfaces for security, access control, BMS and other hotel operational systems.

Guest rooms and suites

The works extended to the refurbishment of guest rooms and suites, providing the electrical infrastructure required for a contemporary luxury-hospitality offering. The wider project introduced 186 redesigned bedrooms and suites, with a focus on improved space, light and residential comfort.

Our guest-room electrical scope included:

  • New and upgraded local electrical distribution, final circuits and containment.
  • General and bedside small power, USB/charging provisions, concealed power supplies and dedicated outlets for hospitality equipment.
  • Lighting installations including ambient, decorative, task, bedside, wardrobe, bathroom and feature lighting.
  • Guest-room lighting-control interfaces, including scene setting and intuitive local control arrangements.
  • Power and containment for television, AV, Wi-Fi, telephony and hotel data systems.
  • Electrical provisions for integrated joinery, mirrors, vanity areas, minibars, safes and specialist guest-room equipment.
  • Emergency lighting and fire-alarm installations coordinated with the bedroom architecture, bathroom layouts and decorative finishes.
  • Coordination with bathroom and specialist trades for illuminated mirrors, shaver supplies, ventilation interfaces, underfloor heating controls and concealed electrical requirements.
  • Final testing, functional checks and commissioning to ensure consistent operation across the accommodation portfolio.

Coordination and delivery

The success of the works depended on intensive and ongoing coordination across a complex luxury-hospitality refurbishment. Electrical services had to be integrated into highly detailed interiors, constrained ceiling voids, bespoke joinery, feature lighting installations and continuously evolving architectural details.

Key aspects of our delivery approach included:

  • Weekly design-team meetings with the architectural lighting designer to review lighting layouts, circuiting, dimming, controls, feature fitting details, control locations and final visual outcomes.
  • Close collaboration with the architect, interior designer, MEP consultants, main contractor, hotel operator and specialist suppliers.
  • Direct coordination with the executive chef and kitchen-design team to establish a kitchen layout that met the operational, technical and service requirements of a high-end destination restaurant.
  • Detailed coordination with joinery, stone, metalwork, ceiling, flooring and decorative-finishes contractors to conceal services and maintain the integrity of the finished interiors.
  • Management of specialist interfaces for data, fire alarm, security, access control, BMS, AV, hotel systems and lighting-control packages.
  • Progressive inspection, testing and commissioning to identify issues early and protect programme certainty across a live hospitality environment.
  • Detailed labelling, certification, record information, O&M documentation and handover support for the hotel's operations and facilities-management teams.

The refurbishment was developed with interior design studio 1508 London, while specialist lighting design played a defining role in the finished hotel. The MEP refurbishment also included renewed restaurants and kitchens, a new fire-alarm system and upgrades across guestrooms and public areas.

Completed outcome

The completed works helped deliver a refined, resilient and carefully concealed electrical infrastructure across one of London's most prominent five-star hotels. From the operational demands of a high-end restaurant kitchen to the precise mood-setting requirements of lobby and dining lighting, the installation was designed to work quietly in the background while supporting an exceptional guest experience.

Encore Building Services is proud to have contributed to the transformation of The Carlton Tower Jumeirah: a technically sophisticated hotel refurbishment that balances luxury, operational performance and the exacting design standards expected of a flagship Knightsbridge property.

Have a Project in Mind?

Contact our team to discuss your requirements. We'll arrange a site visit and provide a detailed, competitive proposal.