Media Centre - AELTC
Scope of Works
We delivered the complete electrical installation for AELTC's new world-class Media Centre at the All England Lawn Tennis Club, Wimbledon. The project created a permanent, purpose-built broadcast, interview and media facility to replace the long-standing reliance on temporary outside-broadcast vehicles and provide the infrastructure required by international broadcasters covering The Championships.
Delivered within the live Wimbledon estate, the scheme was programme-critical, with an immovable completion date ahead of the annual Championships. The electrical works demanded rigorous planning, phased delivery, detailed coordination and robust commissioning to ensure the facility was operational, resilient and ready to support global live broadcast operations.
The completed development comprises advanced broadcast, interview, production and editing facilities, alongside a dedicated Technical Services Room supporting broadcaster connectivity and estate-wide technical infrastructure. The wider media development was created to support thousands of international media representatives and includes state-of-the-art interview, editing and broadcast spaces.
Electrical scope
Encore Building Services' electrical scope included the design coordination, procurement, installation, testing, commissioning and handover of the following systems:
- Incoming electrical infrastructure, including surveys, tracing, protection and diversion of existing high-voltage cabling to facilitate the new foundations and structural works.
- A comprehensive tag-and-trace programme to identify, validate, record and protect live existing services across the construction area, reducing risk to the operational Wimbledon estate.
- Coordination of shutdowns, isolations, diversions and changeovers with AELTC stakeholders to maintain continuity to existing operational facilities.
- Main and local LV distribution systems, including new distribution boards, submains, containment, protective devices, labelling and final circuit installations.
- Earthing, bonding and surge-protection measures appropriate to a technically sensitive broadcast and media environment.
- Full containment installation, including cable tray, basket, trunking, conduit, secondary containment and builder's-work interfaces, coordinated around the structural, architectural and mechanical design.
- General and specialist small-power installations serving media suites, broadcast positions, production spaces, editing areas, interview rooms, technical rooms, welfare areas and back-of-house accommodation.
- Dedicated power provisions for broadcaster equipment, technical racks, IT equipment, AV systems and other specialist media installations.
- Internal and external lighting installations, including general lighting, feature lighting, emergency lighting, external lighting and local controls.
- Intelligent lighting control and emergency-lighting monitoring interfaces, coordinated with the operational requirements of the venue and media users.
- Electrical infrastructure for broadcast, production and editing environments, designed to accommodate high-density technical equipment and evolving broadcaster requirements.
- Power and containment provisions for specialist AV, IT and broadcast systems, including interface coordination with incumbent specialist contractors.
- Data containment and infrastructure coordination for media connectivity, structured cabling and telecommunications installations.
- Electrical containment, power supplies and interfaces for the fire-alarm system, security systems, access control, public-address systems, Rolex clock infrastructure and building management systems.
- Coordination of specialist systems packages falling under the electrical remit, including data, fire, security, PA, access control, BMS and timing systems.
- Plant-room and mechanical-services electrical interfaces, including supplies, local isolators, controls interfaces and coordinated containment routes.
- Close coordination with the mechanical contractor to resolve congested service zones, optimise installation sequencing and maintain access for commissioning and future maintenance.
- Liaison with the main contractor, AELTC, consultants, specialist contractors and end users throughout the works, including design workshops, coordinated services drawings, technical submittals and programme reviews.
- Electrical testing, commissioning, verification, witnessing, certification, as-built documentation, O&M manuals and handover support ahead of the Championships.
Delivery challenges
This was a complex live-estate project, delivered under intense programme pressure and with no flexibility on the completion date. The annual Wimbledon Championships required the new Media Centre to be fully functional in time to support international television, press and broadcast teams.